Originally published by:Aerospace Manufacturing
M4S Take

Middle-ground option: In-spindle automation is presented as a practical alternative between manual loading and full robotic cells.

  • Session details: The IMTS 2026 Conference session on in-spindle automation runs Monday, September 14 at 2:15 P.M. in IMTS10 Room W193-A.
  • Failure-first lessons: The talk analyzes real implementations that didn't work, including root causes and hidden integration costs of 150–200%.
  • Decision tools: Attendees receive a quantitative framework, part compatibility checklist, calculation sheets, and a five-year total cost model to protect ROI and avoid over-automation.
  • Presenter: John Olenik, Partner Success Manager at Jergens Inc. and an Industrial and Systems Engineering graduate from The Ohio State University, aims to deliver honest, vendor-neutral guidance.

Many shops equate automation with buying a robot. But that leap often carries cost, complexity, and risk that a given application doesn't justify — and between manual loading and full robotic cells sits a practical middle ground. That space is the focus of an IMTS 2026 Conference session on in-spindle automation, presented as a simpler, lower-cost alternative to full robotic automation.

The session, from GIE Media's Manufacturing Group, is scheduled for Monday, September 14 at 2:15 P.M. in IMTS10 Room W193-A.

A Failure-First Approach to Automation

Rather than spotlighting success stories, the talk takes a failure-first, engineering-driven approach. It breaks down real implementations that didn't work, analyzes the root causes, and explains what should have been evaluated earlier in the process.

Attendees will come away knowing how to calculate required gripping forces, understand actuation tradeoffs, identify part and machine compatibility issues, and recognize hidden integration costs — the kind that can push total project cost up by 150–200%.

A Framework, Not a Sales Pitch

The session introduces a quantitative decision framework that compares manual, in-spindle, and robotic automation options side-by-side. Clear walk-away criteria are designed to prevent over-automation and protect return on investment (ROI). Attendees also receive tools they can put to work immediately: a part compatibility checklist, engineering calculation sheets, and a five-year total cost model.

The stated goal is honest, vendor-neutral guidance so manufacturers can choose the right level of automation — not necessarily the most automation.

Meet the Presenter

John Olenik, Partner Success Manager at Jergens Inc., leads the session. An Industrial and Systems Engineering graduate from The Ohio State University, Olenik works directly with machine tool builders, integrators, and manufacturers to implement practical automation solutions.

For engineers weighing whether their next productivity step requires a robot — or something simpler — this session offers a structured way to answer the question.

SM

Simon Morton

Editor, M4SNews

With a background in heavy engineering, process engineering, digital marketing & AI. My mission, to cut through the news and make it easy to digest.

M4SNews marks eighteen years of independent operation, connecting manufacturers and engineers with the intelligence that actually matters on the factory floor.

Is this your company?

This article features your business. Claim it to add your logo, contact details, and a link to your website — or upgrade to reach more buyers.

Did you know 80% of Press Releases trigger AI content warnings? Reach out and the M4S team can assist.